Step-by-step VMware Cloud Foundation 4.3 design and install Edge Nodes

In my previous post "Step-by-step VMware Cloud Foundation 4.3 design and install MGMT domain" we have completed VCF management domain deployment.

As we are using version 4.3, which gives us flexibility of deploying either with Static routing or dynamic using BGP, it doesn't deploy edge nodes and no AVN gets created. It actually allows us "Architects" to design and deploy without manual intervention or work around for keeping up with the needs of customer.

In a brown field deployment if you have an underlay network which is configured with static routes, as customer have limited subnets and do not have requirement of rapid network provisioning, they would not want to enable BGP, only to accommodate VCF and to design around this requirement we used work arounds, but now its a straight solution.

Saturday, 20 November 2021

Step-by-Step-NSX-T 3.1 design and Install-P3

In my previous post Step-by-Step-NSX-T 3.1 design and Install-P2 we have have cover configuration of IP pool for host and edge transport node, transport zones, uplink profiles, Distributed switch for nsx, host addition to vds, host transport node profile and finally configuration of NSX on host transport nodes.

Now our esxi hosts are ready to participate in NSX-T datacenter however until we have a working connectivity model it would be of no use. Hence in this post we will take care of EDGE nodes.

To start with, I would urge you all to configure backup of your nsx-t manager cluster, as making it a habit will save you from many unfortunate situations. 