Establishing a backup strategy that fits your business' needs is critical. This includes the frequency of backups, how long they are retained for & amp; ensuring that all storage practices follow necessary security regulations. To assure the effectiveness of your NSX-T backups, it is highly recommended to regularly check the restoration procedures. This will guaranteed the trustworthiness and dependability of your backup files.
Monday, 19 June 2023
NSX-T backup is failing with error code:99
Thursday, 8 June 2023
Step-by-Step-NSX-T 3.1 upgrade
Once NSX-T becomes operational, upgrading the product and keeping it at the latest is something we all have to do.
Hence in this post we will be covering NSX-T upgrade procedure.
First thing is to download the binaries for the upgrade from VMware customer connect portal.
We are currently running version 3.1 and we will be upgrading it to version 3.2. So lets start.
Monday, 5 June 2023
Step-by-Step-NSX-T 3.1 design and Install-P5
Now we have established north south connectivity. Its time we make provision for east west communication.
Based on design decisions and customer requirements you can connect overlay segments to Tier-0 Gateway or Tier-1 gateway. Both will work and machines connected to segments will be able to communicate.
But to keep up with the ever changing needs of technology and customers, its a good choice to go with Tier-1 gateway for your east-west communication. Not just that it has many other use cases.
Tuesday, 30 May 2023
Step-by-Step-NSX-T 3.1 design and Install-P4
Now our NSX-T datacenter is ready to host north south services. In order to facilitate north-south communication we need to deploy virtual router instances.
In NSX-T world these are called T0 and T1 routers.T1 routers are mainly responsible for east-west communication and T0 routers are responsible for north-south communication, this is the reason we call it a 2 tier architecture.
We are also going to follow 2 tier architecture in our deployment, this post is dedicated on deploying and configuring Tier-0 Gateway.
Sunday, 21 May 2023
Step by step configuration of pfsense router part 2
Wednesday, 8 March 2023
Step by step deployment of pfsense router part 1
In my homelab series I used CSR1000v router for providing layer 3 services, however that had a small issue speed.
Tuesday, 20 December 2022
Designing VMware Cloud Foundation? Dont Forget to Consider These..
Building on VMware cloud foundation can be an exciting prospect. However, there are some challenges that architects need to take into consideration before making the jump.
Architects have a lot to consider when deciding whether or not to build the solution on the VMware cloud foundation. Some of the challenges include how much control you want over your environment, what type of workloads it will be running, and if you need to ensure high availability for your workloads. The two major advantages of using a VMware based solution are that it lowers the total cost of ownership and reduces complexity.
Below are the points which an Architects should consider while evaluating VMware Cloud Foundation, as it is a future ready solution and it will enable you to start your cloud first strategy with your own private cloud.
Monday, 21 November 2022
Upgrading NSX-T to version 3.2 getting error?
Monday, 2 May 2022
Step-by-step VMware Cloud Foundation 4.3 design and install decommision Host
In my previous post Step-by-step VMware Cloud Foundation 4.3 design and install Add Host we have added new host to our VMware cloud foundation inventory and then expanded an existing cluster.
Which helped us dealing with the scalability requirement of any SDDC, now its time we move forward with the next requirement of a DC which is removing a host out of cluster or decommissioning a host from the environment.
After we have learned how to remove a host from VMware cloud foundation environment we will move forward with upgrade of the same environment.
In this post I am going to cover removal of a host from existing cluster and decommissioning of the host from a VMware cloud foundation environment.
Sunday, 24 April 2022
Step-by-step VMware Cloud Foundation 4.3 design and install Add Host
In my previous post Step-by-step VMware Cloud Foundation 4.3 design and install vRNI we have completed deployment of vRealize network insight using vRealize lifecycle manager in a VMware cloud foundation environment.
Which was the last product we deployed to make it a complete software defined datacenter (Software Defined Compute, Software Defined Storage and Software Defined Network).
Next thing in the agenda should be scalability of the VMware cloud foundation environment. When I say scalable it covers both vertical and horizontal growth of DC.
In this post I am going to cover expansion of VMware cloud foundation cluster by adding additional host in the inventory and then add it to the required cluster.
Popular posts
-
If you are upgrading or installing your physical server which supports ESXi version 7 update 2 with a warning that it might not be supported...
-
Not long before I was working with one customer and their team reported that they are unable to update ESXi hosts to the latest image using ...
-
In my previous post Home Lab Step-by-Step Part-7-Shared storage , we have configured shared storage, DNS entries and NTP setup. Now we are ...
-
In my previous post Step-by-Step-NSX-T 3.1 design and Install-P5 we have have completed deployment of NSX-T with BGP routing. Once NSX-T b...